超高层结构施工竖向变形规律及预变形控制研究

王化杰, 范 峰, 支旭东, 黄 刚, 祝恩淳, 王 宏

王化杰, 范 峰, 支旭东, 黄 刚, 祝恩淳, 王 宏. 超高层结构施工竖向变形规律及预变形控制研究[J]. 工程力学, 2013, 30(2): 298-305,312. DOI: 10.6052/j.issn.1000-4750.2011.08.0517
引用本文: 王化杰, 范 峰, 支旭东, 黄 刚, 祝恩淳, 王 宏. 超高层结构施工竖向变形规律及预变形控制研究[J]. 工程力学, 2013, 30(2): 298-305,312. DOI: 10.6052/j.issn.1000-4750.2011.08.0517
WANG Hua-jie, FAN Feng, ZHI Xu-dong, HUANG Gang, ZHU En-chun, WANG Hong. RESEARCH OF VERTICAL DEFORMATION AND PREDEFORMATION OF SUPER HIGH-RISE BUILDINGS DURING CONSTRUCTION[J]. Engineering Mechanics, 2013, 30(2): 298-305,312. DOI: 10.6052/j.issn.1000-4750.2011.08.0517
Citation: WANG Hua-jie, FAN Feng, ZHI Xu-dong, HUANG Gang, ZHU En-chun, WANG Hong. RESEARCH OF VERTICAL DEFORMATION AND PREDEFORMATION OF SUPER HIGH-RISE BUILDINGS DURING CONSTRUCTION[J]. Engineering Mechanics, 2013, 30(2): 298-305,312. DOI: 10.6052/j.issn.1000-4750.2011.08.0517

超高层结构施工竖向变形规律及预变形控制研究

基金项目: 国家“十一五”科技支撑项目(2006BAJ01B02);哈尔滨工业大学优秀青年教师培养计划项目(HITQNJS,2007029)
详细信息
    通讯作者:

    王化杰

  • 中图分类号: TU973.12

RESEARCH OF VERTICAL DEFORMATION AND PREDEFORMATION OF SUPER HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • 摘要: 为了掌握超高层结构施工竖向变形累积规律,提出合适的施工预变形分析方法。该文对国内3个400m以上典型超高层结构进行施工全过程仿真研究,开发标准化施工仿真建模方法,综合时变结构离散分析法、龄期调整有效模量法、单元生死、位型控制、分步加荷等关键技术对材料时变,几何时变、边界条件时变进行模拟,形成完整的超高层结构施工全过程仿真技术,得到了不同工况下超高层结构施工竖向变形规律。在此基础上,采用阶段位移补偿法,以竖向位移、框筒内外相对变形为控制目标,建立超高层预变形分析方法,得到了结构施工过程中各层标高预调值,为该类结构的施工变形控制提供了理论依据。
    Abstract: To attain vertical deformation rules for a super high-rise building during the construction and to set up a practical construction simulation method and technology of pre-deformation controlling, the construction full-process analysis of three typical high-rise buildings over 400m high in China were made. The discrete analysis method of a time-varying structure, the age-adjusted effective modulus method, the element birth and dead and technology of stepwise loading were used simultaneously to carry out the simulation of time-varying material, time-varying geometry parameters, time-varying loading and boundary conditions, a systematic technology of simulation of construction process for a super high-rise building was exploited, and the vertical deformation rules were obtained. Furthermore, a pre-deformation analysis method for a super high-rise building was achieved with deformation compensation stepwise. The total vertical displacement and relative deformation between core tube and steel frame were made as the controlling target in the method, which could give vertical pre-deformation values and provide a theoretical support for construction deformation controlling of super high-rise buildings.
  • [1] Baker W F, Korista D S, Novak L C. Buri Dubai: Engineering the world’s tallest building [J]. The Structural Design of Tall and Special Buildings, 2007, 16: 361―375.
    [2] 范峰, 王化杰, 支旭东, 等. 上海环球金融中心竖向变形分析[J]. 建筑结构学报, 2010, 31(7): 118―124.
    Fan Feng, Wang Huajie, Zhi Xudong, et al. Analysis of vertical deformation during construction of Shanghai World Financial Center [J]. Journal of Building Structures, 2010, 31(7): 118―124. (in Chinese)
    [3] 刘学武, 郭彦林, 张庆林, 刘禄宇. CCTV新台址主楼施工过程结构内力和变形分析[J]. 工业建筑, 2007, 37(9): 22―29.
    Liu Xuewu, Guo Yanlin, Zhang Qinglin, Liu Luyu. Analysis of internal force and deformation for the new CCTV Headquarters during the construction process [J]. Industrial Construction, 2007, 37(9): 22―29. (in Chinese)
    [4] 惠荣炎, 黄国兴, 易冰若. 混凝土的徐变[M]. 北京: 中国铁道出版社, 1988: 1―8.
    Hui Rongyan, Huang Guoxing, Yi Bingruo. Concrete creep [M]. Beijing: China Railway Publisher, 1988: 1―8. (in Chinese)
    [5] Bazant Z P. Prediction of concrete creep and shrinkage: past, present and future [J]. Nuclear Engineering and Design, 2001, 203: 27―38.
    [6] Bazant Z P. Prediction of concrete creep effect using age-adjusted effective modulus method [J]. ACI Journal, 1972, 69(4): 212―217.
    [7] 孙宝君. 混凝土徐变理论的有效模量法[J]. 土木工程报, 1993, 26(3): 66―68.
    Sun Baojun. Effective modulus method of concrete creep [J]. China Civil Engineering Journal, 1993, 26(3): 66―68. (in Chinese)
    [8] 王勋文, 潘家英. 按龄期调整有效模量法中老化系数x的取值问题[J]. 中国铁道科学, 1996, 17(3): 12―23.
    Wang Xunwen, Pan Jiaying. Evaluating aging coefficient x in age-adjusted effective modulus method [J]. China Rail Way Science, 1996, 17(3): 12―23. (in Chinese)
    [9] JTG D62-2004, 公路钢筋混凝土及预应力混凝土桥涵设计规范[S]. 北京: 人民交通出版社, 2004.
    JTG D62-2004, Concrete creep code for design of highway reinforced concrete and prestressed concrete bridges and culverts [S]. Beijing: China Communications Press, 2004. (in Chinese)
    [10] Brooks J J, Neville A M. Relaxation of stress in concrete and its relation to creep [J]. ACI Journal, 1976, 73(4): 227―232.
    [11] 王光远. 论时变结构力学[J]. 土木工程报, 2000, 33(6): 105―108.
    Wang Guangyuan. On mechanics of time-varying structures [J]. China Civil Engineering Journal, 2000, 33(6): 105―108. (in Chinese)
    [12] 赵挺生, 李树逊, 顾祥林. 混凝土房屋建筑施工活荷载的实测统计[J]. 施工技术, 2005, 34(7): 63―65.
    Zhao Tingsheng, Li Shuxun, Gu Xianglin. On site measure and statistic of live construction load of concrete buildings [J]. Construction Technology, 2005, 34(7): 63―65. (in Chinese)
    [13] 博弈创作室. ANSYS9.0经典产品高级分析技术与实例详解[M]. 北京: 中国水利水电出版社, 2005: 364―370.
    Boyi Studio. Senior analysis technology and examples explain of ANSYS9.0 [M]. Beijing: China Waterpower Press, 2005: 364―370. (in Chinese)
    [14] 陈灿. 高层钢框架-混凝土核心筒混合结构体系施工期间变形及其控制研究[D]. 上海: 同济大学, 2007.
    Chen Can. Research on deformation and control during construction of high-rise steel frame-concrete corewall mixed structure [D]. Shanghai: Tongji University, 2007. (in Chinese)
计量
  • 文章访问数:  490
  • HTML全文浏览量:  22
  • PDF下载量:  139
  • 被引次数: 0
出版历程
  • 刊出日期:  2013-02-24

目录

    /

    返回文章
    返回