赵作周, 周剑, 侯建群, 任宝双. 上下层插筋连接预制混凝土空心模剪力墙有限元分析[J]. 工程力学, 2017, 34(1): 117-129. DOI: 10.6052/j.issn.1000-4750.2015.05.0411
引用本文: 赵作周, 周剑, 侯建群, 任宝双. 上下层插筋连接预制混凝土空心模剪力墙有限元分析[J]. 工程力学, 2017, 34(1): 117-129. DOI: 10.6052/j.issn.1000-4750.2015.05.0411
ZHAO Zuo-zhou, ZHOU Jian, HOU Jian-qun, REN Bao-shuang. FINITE ELEMENT ANALYSIS OF SHEAR WALLS WITH PRECAST CONCRETE HOLLOW MOULDS AND SPLICE REBAR CONNECTION BETWEEN THE UPPER AND LOWER FLOORS[J]. Engineering Mechanics, 2017, 34(1): 117-129. DOI: 10.6052/j.issn.1000-4750.2015.05.0411
Citation: ZHAO Zuo-zhou, ZHOU Jian, HOU Jian-qun, REN Bao-shuang. FINITE ELEMENT ANALYSIS OF SHEAR WALLS WITH PRECAST CONCRETE HOLLOW MOULDS AND SPLICE REBAR CONNECTION BETWEEN THE UPPER AND LOWER FLOORS[J]. Engineering Mechanics, 2017, 34(1): 117-129. DOI: 10.6052/j.issn.1000-4750.2015.05.0411

上下层插筋连接预制混凝土空心模剪力墙有限元分析

FINITE ELEMENT ANALYSIS OF SHEAR WALLS WITH PRECAST CONCRETE HOLLOW MOULDS AND SPLICE REBAR CONNECTION BETWEEN THE UPPER AND LOWER FLOORS

  • 摘要: 讨论了有限元软件ABAQUS中模拟新老混凝土界面的不同方法,建议了有限元界面模型的参数定义方法,并通过试验验证了其合理性。基于新老混凝土界面模拟方法,对上下层插筋连接的预制混凝土空心模剪力墙的有限元模拟方法进行了验证。通过恒定轴压力及单调水平力作用下的有限元推覆分析,针对空心模剪力墙的受力性能进行了关于插筋搭接长度、插筋端头位置、插筋总受拉承载力、后浇混凝土强度和轴压比的参数分析。结果表明,所采用的新老混凝土界面模拟方法及基于其进行的空心模剪力墙有限元模拟准确、合理;插筋搭接长度取1.2倍锚固长度能够满足要求;增大插筋总受拉承载力可提高墙体承载力,受拉开裂较严重的区域上移并向内延伸;为充分发挥墙体的承载能力,建议后浇混凝土强度不应低于预制混凝土强度;轴压比较大时,墙体受压损伤区域增多,影响墙体的承载力稳定性和变形能力,建议在墙体底部增设拉筋及水平分布筋,以改善墙体在较高轴压比下的抗震性能。

     

    Abstract: Different methods in ABAQUS available for simulating the behavior of new and old concrete interfaces are discussed. Definition methods of surface model's parameters for finite element analysis are suggested and verified by predicting the existing experimental results. Based on the simulation method of the new and old concrete interfaces, the finite element analysis method of shear walls with precast concrete hollow moulds and splice rebar connection is verified. Based on the finite element pushover analysis of shear walls under constant axial loading and monotonic horizontal loading, the parametric study on the mechanical behavior of the shear walls considering the effects of rebar splice length, the total tension capacity of splice rebars, the position of splice rebar's top end, the strength of cast-in-place concrete and axial force ratio is carried out. The results indicate that the adopted finite element analysis methods for the new and old concrete interfaces and shear walls are reasonable and reliable. The splice length of 1.2 times the anchorage length of splice rebar can satisfy the minimum requirements. The strength capacity of the shear wall can be improved and the severe tension crack zone moves up and extends inwards by increasing the total tension capacity of splice rebars. To assure the strength capacity of the shear wall, the strength of cast-in-place concrete should not be lower than that of precast concrete. The zone of compression damage expands and the stability and deformability of the strength capacity are affected when the axial force ratio of shear wall is large. It is suggested that more transverse tie rebars or horizontal distributed rebars should be placed at the bottom of the shear wall to improve the seismic performance of the shear wall.

     

/

返回文章
返回