LIANG Zhi-guang, LI Jian-zhong, SHI Xian-feng. THE DETERMINATION OF THE INITLAL CABLE FORCES FOR CABLE-STAYED BRIDGES[J]. Engineering Mechanics, 2000, 17(3): 121-126.
Citation: LIANG Zhi-guang, LI Jian-zhong, SHI Xian-feng. THE DETERMINATION OF THE INITLAL CABLE FORCES FOR CABLE-STAYED BRIDGES[J]. Engineering Mechanics, 2000, 17(3): 121-126.

THE DETERMINATION OF THE INITLAL CABLE FORCES FOR CABLE-STAYED BRIDGES

  • This apaer is concerned with the deermination of the initial cable forces of cable stayed bridges. A forward-analysis method is introduced, in which the actural construction process is considered . The influences of geometric nonlinearity, shrinkage and creep of concrete are taken into account. It is shown that the method is more comprehensive, easier and more accurate than previous methods . With the initial cable forec determined by the present method, the final cable force and shape can be determined easily . Consequently, the workload of construction control human, material and financial resources are reduced substantially . A program based on the method is devloped The P-K cable-stayed bridge of America has been analyzed .
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return